Turnkey Power Solutions

Project Management Life Cycle

Looking for a trusted partner to Execute your Electrical Projects?

At Torrent electricals we offer Turnkey Solutions up to 132KV for Industries, Utilities, Independent Power Producers, Renewable Energy Projects, and Transmission System operators.

Project Management Life Cycle

What do we Offer?

Design and engineering of transmission systems, including substations.

Supply and installation of electrical equipment.

Commissioning, testing and certification as per scope

Partner with Us: Unlock a
Win-Win Advantage

At Torrent Electricals, we believe in fostering long-term relationships built on trust, reliability, and mutual growth. Our "Win-Win" proposal is designed to empower your business with unparalleled benefits, ensuring success for both our organizations.

Four Pillars of Our Partnership Proposal:

  • 1

    Reduce Project Delays

    Streamline your projects with our timely delivery of high-quality cables, ensuring your timelines are met and your reputation is enhanced.

  • 2

    Increase Efficiency

    Our cutting-edge products and expert technical support enable seamless installation, minimizing downtime and maximizing productivity.

  • 3

    Cost Optimization

    Benefit from competitive pricing, reduced waste, and optimized resource allocation, resulting in significant cost savings.

  • 4

    Trusted Customer Service

    Experience unparalleled support through our dedicated customer service team, ensuring prompt resolution of queries and concerns.

Partner with Us: Unlock a Win-Win Advantage

We make it Simple and Transparent, Step By Step

Route Survey

Identifying the best route and obtaining necessary permissions

Cable System Design

Designing the cable system with specified materials and ensuring compliance.

Construction for Cable Trench

Designing the cable system with specified materials and ensuring compliance.

Cable Laying

Laying cables in trenches, ensuring proper alignment, security, and protection.

Cable Jointing

Connecting cables with secure, reliable, and weatherproof joints

Termination

Terminating cables at substations and other termination points.

Testing & Commissioning

Testing the cable system to ensure compliance and commissioning the system once successful.

Project Management Life Cycle

And there is more to offer, we also execute

Conversion

Conversion of existing overhead lines to underground cable laying network.

Loop-In-Loop-Out(LILO)

The project involves connecting existing EHV (Extra High Voltage) substations to a new underground cable network, which requires careful planning and execution to ensure that the substations are not affected by the change.

Load growth schemes

The project aims to accommodate future load growth by designing and installing a system that can handle increased power demand over time.

Plan-Execute and Achieve

Torrent Electricals underlines the importance of project schedules to ensure timely completion of project deliverables. We implement Project management methodologies and tools, including the Critical Path Method, to achieve realistic timelines and ensure consistent delivery schedule..

Project Timeliness: Delivering on Schedule

At Torrent Electricals, we prioritize project schedules to ensure seamless execution and timely completion of deliverables. Our project management approach leverages proven methodologies and tools, like the Critical Path Method and Agile Project Management to establish realistic timelines, ensure consistent delivery schedules and enhance project visibility and control

Project Timeliness: Delivering on Schedule

Visual and mechanical inspections to ensure safety and functionality.

Electrical tests to identify potential issues, if any.

Testing performed in the presence of a customer representative for transparency and accountability.

Issuance of a completion certificate/report outlining scope of work, testing results, and deviations.

Certification process ensures compliance with scope, specifications, and regulations.

Documentation provides a formal record of the project's status and serves as a basis for future maintenance, upgrades, modifications, and sign-off

Driven by Strong Values
Torrent Pharma Logo

The Last Mile

After performing all required Tests, the team hands over the completed project to the customer, providing essential documents, including drawings, operation manuals, user guides, and warranty information.